  • 15. Support weekly report 13.11-19.11 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status
    Done In progress hold

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Lean-Sharp


    LS-33

    Done

    13.11

    17.11

    12m

    Dr. Lean

    Issues with cache


    LS-32

    Done

    10.11

    13.11

    1h 25m

    Nadia Dzhyhan

    Total time

    1h 37m

    boa


    BOA-91

    Done

    16.11

    17.11

    1h 7m

    Danny Kurasinski

    fix view for some texts on Live


    BOA-88

    Done

    18.10

    17.11

    1h 29m

    Danny Kurasinski

    fix blocks with circles for Live

    Total time

    2h 36m

    COBAX


    CBX-141

    Done

    19.10

    16.11

    3h 15m

    Egzon Cekaj

    Infinity scroll


    CBX-147

    Done

    14.11

    17.11

    1h 49m

    Liliano Tenore

    Adjust style of text as in the editor with paragraphs


    CBX-142

    Done

    7.11

    16.11

    1h 35m

    Egzon Cekaj


    CBX-140

    Done

    19.10

    17.11

    1h 54m

    Egzon Cekaj

    change the view of prices for category page


    CBX-143

    Done

    7.11

    16.11

    41m

    Egzon Cekaj


    CBX-133

    Done

    26.09

    17.11

    1h 23m

    Liliano Tenore

    Work with paid version of the plugin


    CBX-145

    Done

    9.11

    13.11

    20m

    Egzon Cekaj

    Fixes after update WordPress

    Total time

    10h 56m

    Gefra


    GEF-22

    In progress

    16.11

    53m

    Severin Bucher

    Preparing estimation

    Total time:

    53m

    Just.Swiss


    JS-8

    In progress

    25.10

    18-20h

    24m

    Danny Kurasinski

    wait approve estimation


    JS-12

    In progress

    14.11

    5-6h

    47m

    Danny Kurasinski

    estimation approved, can start

    Total time:

    1h 11m

    PET


    PET-18

    Done

    13.11

    13.11

    1h 15m

    Severin Bucher

    fix margin style


    PET-20

    Done

    13.11

    13.11

    25m

    Severin Bucher

    enable the plugin after last fixes

    Total time:

    1h 40m

    Win4Win


    W4W-100

    Done

    6.11

    17.11

    5.5-7h

    W: 5h 17m
    (4:32 Tetyana)
    T: 7h 28m

    Egzon Cekaj

    Estimation 5.5-7h was for implement functionality in the admin panel. But in the tracking hours included manual download file for Egzon, that not included into estimation.


    W4W-105

    Done

    8.11

    16.11

    8m

    Danny Kurasinski

    Total time:

    5h 25m

    WSA


    WSA-28

    Done

    16.11

    17.11

    2h

    2h

    Danny Kurasinski

    Removed the select field from checkout page


    WSA-29

    Done

    16.11

    17.11

    2h

    15m

    Danny Kurasinski

    Total time

    2h 15m

    Fuji


    FUJI-86

    In progress

    6.11

    4h (Olga)
    1h (PM)

    Liliano Tenore

    Made investigation, sent answers and instructions
    Need to compare the clicks in google ads and analytics

    Total time

    5h

    EVZ


    OLEAS-1

    In progress

    8.11

    3h (Olga)
    45m (PM)

    Liliano Tenore

    Added analytics tracking of conversions to the new Google ads account
    Need to check duplications of conversions

    Total time

    3h 45m

    Thorndyke


    THR-41

    Done

    15.11

    16.11

    1h 8m

    Jason

    Total time

    1h 8m

    Total support time

    37h 26m (Margin: ~36%/20%)

    UST (Calc Getitback)

    In progress

    27.10

    Initial: 24-30h

    Approved: 32h

    Wait approving: 36h

    W: 21h 55m

    T: 62h 22m

    Andrii (Getitback)

    Margin ~40%

    Wait approving new request (statistic and file generation) – 4h

    Approved new request – 2h

    In progress one bug – issue with opening file docx

    Stingray

    Hold

    325h
    +23h (new requests)

    W: 16m
    T: 514h 27m
    Dev+QA: 474h 34m
    PM: 40h 53m

    Margin ~69%

    Wait client, still add content

    Before go to the live we have to implement and add several versions of languages.

  • 14. Support weekly report 06.11-12.11 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status
    Done In progress hold

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Lean-Sharp


    LS-31

    Done

    7.11

    8.11

    1h 4m

    Nadia Dzhyhan 


    LS-32

    Done

    10.11

    10.11

    1h 0m

    Nadia Dzhyhan 


    LS-30

    Done

    7.11

    8.11

    1h 30m

    Nadia Dzhyhan 

    Total time

    3h 34m

    Bluecare


    BLUEC-557

    hold

    8.11

    1h

    23m

    Severin Bucher

    wait approving estimation


    BLUEC-558

    Done

    9.11

    9.11

    15m

    Severin Bucher

    Total time

    37m

    boa


    BOA-88

    hold

    18.10

    25m

    Danny Kurasinski

    wait feedback

    Total time

    25m

    Casa-Nobile


    CN-126

    Done

    6.10

    10.11

    3h 9m

    Egzon Cekaj

    Update the composer to better connection with server of generation barcode

    Total time

    3h 9m

    COBAX


    CBX-145

    Done

    9.11

    10.11

    2h

    Egzon Cekaj

    Back to previous wordpress version


    CBX-133

    hold

    26.09

    28m

    Egzon Cekaj

    Communication about paid version of plugin

    Total time

    2h 28m

    FUJI


    FUJI-86

    In progress

    6.11

    15m

    Liliano Tenore

    need to investigate with Olga

    Total time

    15m

    Gefra


    GEF-20

    Done

    10.11

    10.11

    2h

    Egzon Cekaj

    After updating wordpress needed to update the plugins as well (without updates the site was crushed)

    Total time:

    2h

    PET


    PET-16

    Done

    9.11

    10.11

    9h 40m

    Severin Bucher

    After update wordpress we had to fix the functionality of the site

    Total time:

    9h 40m

    Win4Win


    W4W-103

    hold

    7.11

    2h 15m

    Danny Kurasinski

    wait response from client about possible implementations


    W4W-101

    Done

    7.11

    8.11

    1h 8m

    Danny Kurasinski

    change styles


    W4W-106

    Done

    9.11

    9.11

    23m

    Danny Kurasinski

    investigation in admin panel and content on different languages


    W4W-104

    In progress

    5m

    need to fix CI/CD


    W4W-107

    hold

    9.11

    27m

    Danny Kurasinski

    wait fix CI/CD

    Total time:

    4h 17m

    WSA


    WSA-27

    Done

    7.11

    8.11

    32m

    Danny Kurasinski

    Total time

    32m

    Total support time

    26h 57m

    UST (Calc Getitback)

    In progress

    27.10

    26-32h

    20h 18m (last week)

    40h 27m (total)

    Andrii (Getitback)

    Margin ~78%

    Almost finished, need to fix bugs

    Added to initial estimation 2h

    Decided to finish the project with Pavlo

    Stingray

    Hold

    325h
    +23h (new requests)

    514h 11m (total)
    474h 18m (dev+qa)
    40h 53m (pm)
    3h 34m (last week)

    Wait client, still add content

    We had small bugs last week

    Before go to the live we have to implement and add several versions of languages.

  • 13. Support weekly report 30.10-05.11 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status
    Done In progress hold

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Cobax


    CBX-140

    Hold

    19.10

    1h 20m

    Luca Campanaro

    Need to analyze with client possible implementations

    Total time

    1h 20m

    FUJI


    FUJI-85

    Done

    3.11

    3.11

    45m

    Severin Bucher

    fix layouts

    Total time

    45m

    Flytte


    FLT-169

    Done

    16.10

    31.10

    2h

    Mikael

    Fix the emails sendings and prepare the email with list of orders to print


    FLT-168

    In progress

    6.10

    1h

    Mikael

    Solve the problem with duplication orders in stripe


    FLT-167

    Done

    6.10

    31.10

    1h

    Mikael

    implement strex keys

    Total time

    4h

    FWFO


    FAIR-38

    Done

    19.10

    1.11

    1h 39m

    Severin Bucher

    prepare temporary main page, work with devops on client side, very difficult CI/CD flow

    Total time

    1h 39m

    Boa


    BOA-88

    Hold

    18.10

    17m

    Danny Kurasinski

    Done on stage, wait review

    Total time

    17m

    Auto-Monkey


    TL-127

    Done

    27.10

    30.10

    6-8h

    4h 49m

    Luca Campanaro

    prepare settings page for autosending letters


    TL-128

    Done

    3.11

    3.11

    24m

    Luca Campanaro

    investigate issue about 4th emails

    Total time

    5h 13m

    Casa-Nobile


    CN-131

    Done

    23.10

    3.11

    3.5-4.5

    3h 34m

    Luca Manz

    fix the problem that shows dashboard panel


    CN-126

    Hold

    06.10

    45m

    Luca Manz

    investigation of the plugin that creates the lables and bar codes

    Total time:

    4h 18m

    NUCC


    NUCC-18

    Done

    24.10

    3.11

    3-4h

    2h 56m

    Kjartan

    investigate and solve hosting’s security suggestions

    Total time:

    2h 57m

    Just.Swiss


    JS-11

    Done

    2.11

    3.11

    1h 2m

    fix the stage on one line side, to show some tasks for clients


    JS-8

    Hold

    25.10

    32-38h

    35m

    Danny Kurasinski

    sent estimation with suggestions

    Total time:

    1h 36m

    Win4Win


    W4W-94

    Done

    23.10

    31.10

    7-8h

    7h 21m

    Chiara Gragnano

    new type of contests


    W4W-96

    Done

    30.10

    30.10

    1h 32m

    Chiara Gragnano

    fix mobile mobile version, long loading some page


    W4W-99

    Done

    3.11

    3.11

    2h 11m

    Egzon Cekaj

    prepare list of contacts for 100 cities


    W4W-98

    Done

    3.11

    3.11

    1h

    Danny Kurasinski

    investigate how to do it from the admin panel (content on French side)


    W4W-97

    Done

    30.10

    3.11

    42m

    Chiara Gragnano

    change loyout

    Total time

    12h 46m

    WSA


    WSA-22

    Done

    25.10

    1.11

    3.5-4.5

    2h 58m

    Luca Manz

    Solve isses with spam, implement SPF and DKIM

    Total time

    2h 58m

    Chiidaspa


    CHIDA-53

    Done

    31.10

    31.10

    15m

    Danny Kurasinski

    There was a problem with cache on main page


    CHIDA-54

    Done

    2.11

    2.11

    2h 18m

    Danny Kurasinski

    Can’t finish booking because of error with code on finish step

    Total time

    2h 33m

    UST (Calc Getitback)


    UST-122

    In progress

    27.10

    8-10h

    5h 48m

    Andrii (Getitback)

    Almost finish Back end part


    UST-123

    In progress

    27.10

    8-10h

    4h 14m

    Andrii (Getitback)

    Almost finish Back end part


    UST-126

    Done

    27.10

    2.11

    4-5h

    5h 30m

    Andrii (Getitback)

    Finished Front-End part

    Total time

    15h 32m

    Total support time

    51h 54m

    Stingray

    Hold

    325h
    +23h (new requests)

    511h 37m (total)
    470h 44m (dev+qa)
    40h 53m (pm)
    1h 59m (last week)

    On Friday evening had some questions regarding fill out the content.

    Before go to the live we have to implement and add several versions of languages.

  • 12. Support weekly report 23.10-29.10 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Cobax


    CBX-137

    In progress

    9.10

    2h 38m

    Luca Campanaro

    need to find solution


    CBX-139

    hold

    12.10

    42m

    Luca Campanaro

    Wait client’s response


    CBX-133

    Done

    26.09

    23.10

    55m

    Liliano Tenore

    Total time

    4h 15m

    FUJI


    FUJI-84

    25.10

    26.10

    46m

    Severin Bucher

    Total time

    46m

    Flytte


    FLT-169

    In progress

    16.10

    1h 30m

    Mikael


    FLT-168

    In progress

    06.10

    1h 0m

    Mikael

    Total time

    2h 30m

    FWFO


    FAIR-38

    In progress

    19.10

    7h 20m

    Severin Bucher

    Very complicated workflow with DevOps Peter from Philipines, have to finish this task today-tomorrow

    Total time

    7h 20m

    Boa


    BOA-89

    Done

    23.10

    23.10

    1h 3m

    for check the bugs, that appeared on live, because content is different on stage and live


    BOA-81

    In progress

    28.08

    1h

    noticed the bug in admin panel settings


    BOA-88

    In progress

    18.10

    39m

    wait client’s feedback

    Total time

    2h 43m

    Auto-Monkey


    TL-127

    In progress

    27.10

    6-8h

    1h 33m

    Luca Campanaro


    TL-126

    Done

    23.10

    23.10

    12m

    Luca Campanaro

    Total time

    1h 45m

    Casa-Nobile


    CN-130

    Done

    23.10

    24.10

    1h 11m

    Luca Manz


    CN-129

    Done

    23.10

    24.10

    1h 23m

    Luca Manz


    CN-128

    Done

    20.10

    23.10

    25m

    Luca Manz


    CN-126

    In progress

    06.10

    24m

    Luca Manz


    CN-131

    Hold

    23.10

    1 – 30m
    2 – 3-4h
    3 – unpredictable

    16m

    Luca Manz

    Wait decision about this updates from client.


    CN-127

    Done

    06.10

    25.10

    16m

    Luca Manz

    Total time:

    3h 54m

    NUCC


    NUCC-18

    In progress

    24.10

    35m

    Kjartan

    Total time:

    35m

    Just.Swiss


    JS-10

    Done

    27.10

    27.10

    1h 1m

    we couldn’t login to the stage


    JS-8

    Hold

    25.10

    32m

    Danny Kurasinski

    Wait client’s answers to make a proper estimation

    Total time:

    1h 33m

    Win4Win


    W4W-95

    Done

    25.10

    26.10

    1h 29m

    Boris Schaefer 


    W4W-94

    Hold

    23.10

    7-8h

    56m

    Chiara Gragnano

    wait approving the estimation

    Total time

    2h 45m

    WSA


    WSA-22

    In progress

    25.10

    3.5-4.5h

    46m

    Luca Manz


    WSA-25

    Done

    26.10

    26.10

    32m

    Danny Kurasinski 

    Total time

    1h 18m

    Lean-Sharp


    LS-27

    Done

    23.10

    24.10

    23m

    Dr. Lean


    LS-26

    Done

    20.10

    24.10

    13m

    Nadia Dzhyhan 

    Total time

    36m

    UST (Calc Getitback)


    UST-122

    In progress

    27.10

    24-30h in total

    3h 21m

    Approved estimation for a small project. Getitback calculator 2.0

    Total time

    3h 21m

    Total support time

    33h 21

    Stingray

    Hold

    325h
    +23h (new requests)

    509h 38m (total)
    468h 45m (dev+qa)
    40h 53m (pm)
    4h 55m (last week)

    All current tasks and tests was delivered to the client, wait their feedback. Before go to the live we have to implement and add several versions of languages.

    On current week (from 30.10) they will start to add a content.

  • 11. Support weekly report 16.10-22.10 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Cobax


    CBX-133

    In progress

    26.09

    6h 26m

    Liliano Tenore

    Investigation why the plugin isn’t working correctly


    CBX-137

    In progress

    9.10

    54m

    Luca Campanaro

    Total time

    7h 20m

    One-Line


    OL-292

    Done

    17.10

    19.10

    4h 4m

    Amire Berisha


    OL-296

    In progress

    19.10

    2h 55m

    Amire Berisha


    OL-286

    Done

    11.10

    19.10

    2h 26m


    OL-287

    Done

    11.10

    20.10

    2h 25m


    OL-293

    In progress

    18.10

    57m

    Amire Berisha


    OL-290

    Done

    11.10

    20.10

    1h 3m

    Liliano Tenore


    OL-289

    Done

    13.10

    20.10

    31m

    Amire Berisha

    Total time

    14h 21m

    FUJI


    FUJI-80

    Done

    11.10

    16.10

    1-1.5h

    This week: 1h 4m
    Total: 1h 54m

    Severin Bucher 


    FUJI-81

    Done

    11.10

    16.10

    2.5-3h

    This week: 56m
    Total: 2h 28m

    Severin Bucher 

    Total time

    1h 58m

    Flytte


    FLT-169

    In progress

    16.10

    3h 37m

    Mikael

    Emails are not being sent

    Total time

    3h 37m

    FWFO


    FAIR-38

    In progress

    2h 30m

    Severin Bucher 

    Prepare page to show it on live as temp main page

    Total time

    2h 30m

    Boa


    BOA-88

    In progress

    18.10

    old task

    7h 9m

    Egzon Cekaj

    Some corrections for bubbles on live with content as on live


    BOA-86

    Done

    5.10

    17.10

    old task

    2h 12m

    Danny Kurasinski


    BOA-81

    In progress

    28.08

    old task

    15m

    Danny Kurasinski


    BOA-80

    In progress

    17.08

    old task

    10m

    Danny Kurasinski

    Total time

    9h 45m

    Auto-Monkey


    TL-125

    Done

    16.10

    17.10

    3h 23m

    Luca Campanaro


    TL-124

    Done

    16.10

    17.10

    1h 26m

    Luca Campanaro


    TL-120

    Done

    27.09

    17.10

    40m

    Luca Campanaro

    Total time

    5h 29m

    Casa-Nobile


    CN-127

    In progress

    6.10

    31m

    Luca Manz


    CN-125

    Done

    8.09

    20.10

    4-10h

    6h 18m

    Luca Manz

    Total time:

    6h 48m

    Saner


    SAN-1

    In progress

    12.10

    4h 31m

    Severin Bucher 

    Total time:

    4h 31m

    Lean-Sharp


    LS-26

    Done

    20.10

    20.10

    2h 32m

    Nadia Dzhyhan

    Total time

    2h 32m

    Total support time

    57h 51m

    Stingray

    Hold

    325h
    +23h (new requests)

    504h 43m (total)
    463h 50m (dev+qa)
    40h 53m (pm)
    20h 3m (last week)

    All current tasks and tests was delivered to the client, wait their feedback. Before go to the live we have to implement and add several versions of languages.

  • 10. Support weekly report 09.10-15.10 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Cobax


    CBX-137

    In progress

    9.10

    1h 47m

    Luca Campanaro

    after 50-100 cost do not show paid delivery


    CBX-136

    Done

    9.10

    11.10

    49m

    Luca Campanaro

    Hide some icons on checkout


    CBX-135

    Done

    9.10

    11.10

    32m

    Luca Campanaro

    fix the style of placeholder in Firefox


    CBX-138

    Done

    9.10

    11.10

    22m

    Luca Campanaro

    fix email text

    Total time

    3h 30m

    FUJI


    FUJI-79

    Done

    4.10

    11.10

    2h 13m

    Severin Bucher 

    implement french urls


    FUJI-80

    In progress

    11.10

    1-1.5h

    51m

    Severin Bucher 

    make ability to change text on mobile and desktop separately


    FUJI-81

    In progress

    11.10

    2.5-3h

    52m

    Severin Bucher 

    add video to the page (youtube or upload) with autoplay settings


    FUJI-82

    Done

    11.10

    15.10

    0.7-1h

    19m

    Severin Bucher 

    hide navigation bar

    Total time

    4h 16m

    Porsche


    PRSCH-159

    Done

    1h 4m

    Danny Kurasinski

    new feedback file


    PRSCH-158

    In progress

    2h ?

    Danny Kurasinski

    some letter went to spam in client’s cases, need to check the domain and settings

    Total time

    ?

    Propsnoop


    PROP-9

    25.09

    10.10

    1h 12m

    Thomas

    fix links for different sliders

    Total time

    Boa


    BOA-86

    Done

    6.10

    13.10

    6h 31m

    Danny Kurasinski

    fix styles for the boxes


    BOA-87

    In progress

    6.10

    19m

    internally

    fix ci/cd process

    Total time

    6h 51m

    Auto-Monkey


    TL-122

    Done

    09.10

    11.10

    2h 22m

    Luca Campanaro

    fix issue with birthday format in upload file


    TL-123

    Done

    12.10

    12.10

    1h 14m

    Luca Campanaro

    add new status to the table

    Total time

    3h 37m

    Casa-Nobile


    CN-127

    In progress

    6.10

    1h

    Luca Manz

    change amount of greetings card on checkout


    CN-126

    In progress

    6.10

    2h ?

    Luca Manz

    need to rewrite plugin for showing correct post label and bar code

    Total time:

    ?

    Saner


    SAN-1

    In progress

    12.10

    1h ?

    Severin Bucher 

    Can’t receive a letter after finishing the form

    Stingray

    In progress

    325h
    +23h (new requests)

    484h 40m (total)
    443h 47m (dev+qa)
    40h 53m (pm)
    11h 5m (last week)

    Fixing the bugs for bigger resolution, implement new pages with new design. For now have to implement images without background.

  • 9. Support weekly report 02.10-06.10 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Cobax


    CBX-130

    Done

    02.10

    41m

    Luca Campanaro

    Fix the work of the plagin Heidipay, make Ort as basic field, not custom


    CBX-131

    Done

    02.10

    20m

    Luca Campanaro

    Fix stales for text in the cart

    Total time

    1h 1m

    Bluecare


    BLUEC-556

    Done

    03.10

    03.10

    41m

    Severin Bucher 

    Delete the title for some forms


    BLUEC-549

    Done

    13.09

    03.10

    10m

    Severin Bucher 

    Investigation for new landing page

    Total time

    51m

    Lean-Sharp


    LS-25

    Done

    03.10

    03.10

    23m

    Make the page visible

    Total time

    23m

    Schulthess


    SCHUL-13

    Done

    03.10

    04.10

    4h 30m

    Fix the links redirections on live and stage

    Total time

    4h 30m

    Boa


    BOA-86

    In progress

    5.10

    2h 43m

    change styles for the box


    BOA-87

    In progress

    5.10

    22m

    sync stage and live

    Total time

    3h 6m

    Auto-Monkey


    TL-117

    Done

    54m

    Luca Campanaro

    fixes with lux travel tab, conflict with other tab-services

    54m

    Chiidaspa


    CHIDA-52

    Done

    5h 11m

    investigation about deleted code

    Total time:

    6h 1m

    Propsnoop


    PROP-9

    In progress

    2h 19m

    Thomas

    The links on slides don’t work


    PROP-10

    Done

    42m

    Ability to work with stage

    Total time:

    3h 1m

    Stingray

    In progress

    325h
    +23h (new requests)

    473h 35m (total)
    432h 42m (dev+qa)
    40h 53m (pm)
    23h 47m (last week)

    Finish all tasks by Wednesday (4.10), as was agreed. Everyday feedback from client. On Friday (06.10) received new requests, visual design changes and feedback about video animation (still in progress). Next checkup meeting on Tuesday (10.10)

  • 8. Support weekly report 25.09-29.09 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Cobax


    CBX-125

    Done

    28.09

    4h 41m

    Luca Campanaro

    save contacts while user fill out the checkuot steps


    CBX-129

    Done

    28.09

    4h 48m

    Update git for live


    CBX-132

    Done

    28.09

    34m

    Luca Campanaro

    Change text


    CBX-115

    Done

    28.09

    31m

    Luca Campanaro

    Add text at some checkout places


    CBX-127

    Done

    28.09

    6m

    Luca Campanaro

    Remove the chechbox for terms and condition


    CBX-128

    Done

    28.09

    3m

    Luca Campanaro

    Change the text, button


    CBX-117

    Done

    28.09

    2m

    Luca Campanaro

    Products area should be clickable


    CBX-131

    Done

    28.09

    2m

    Luca Campanaro

    fix the text view


    CBX-133

    Done

    26.09

    26.09

    24m

    Liliano Tenore

    just install the plugin, waiting new task according to the google shop

    Total time

    11h 9m

    Bluecare


    BLUEC-553

    Done

    26.09

    28.09

    1.5-2h

    1h 10m

    Severin Bucher 

    change styles


    BLUEC-552


    BLUEC-555

    Done

    26.09

    29.09

    2-2.5h

    1h 57m

    Severin Bucher 

    change the logic for destination page after sending form


    BLUEC-549

    Done

    29.09

    27m

    Severin Bucher 

    add FR and IT languages for the form

    Total time

    3h 34m

    Rosarot


    ROS-21

    Hold

    14-19h

    13m

    Luca Manz

    Need to add blog page, wait approving

    Total time

    13m

    Boa


    BOA-84

    Done

    29.09

    4h 37m

    Danny Kurasinski

    Change the filters of first column and column years

    Total time

    4h 37m

    Auto-Monkey


    TL-120

    In progress

    27.09

    2h 26m

    Luca Campanaro

    Auto send big amounts of lead with settings


    TL-117

    In progress

    21.09

    2h 12m

    Luca Campanaro

    Add new tab-service


    TL-121

    Done

    27.09

    27.09

    1h 3m

    Luca Campanaro

    Add new tab-service


    TL-119

    22.09

    25.09

    8m

    Luca Campanaro

    Total time:

    6h 1m

    Stingray

    In progress

    325h
    +23h (new requests)

    449h 48m (total)
    408h 55m (dev+qa)
    40h 53m (pm)
    1h 38m (last week)

    The client escalated. A meeting was held with managers and supervisors from both parties. It was agreed to provide updated animation functionality by Wednesday (4.10), and tasks were approved as new requesters for 23 hours.

  • 7. Support weekly report 18.09-22.09 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Cobax


    CBX-130

    In progress

    18.09

    4h 18m

    Luca Campanaro

    Fix the functionality of plugin HeidiPay


    CBX-119

    Done

    18.09

    22.09

    4h 15m

    Luca Campanaro

    Improve hover effect in the fields


    CBX-121

    Done

    18.09

    22.09

    3h 4m

    Luca Campanaro

    Add dropdown to contact form


    CBX-120

    Done

    18.09

    22.09

    3h 10m

    Luca Campanaro

    fix the fields when you click back in browser


    CBX-127

    Done

    18.09

    22.09

    1h 41m

    Luca Campanaro

    Remove checkbox term and conditions


    CBX-123

    Done

    18.09

    22.09

    1h 3m

    Luca Campanaro

    if one option on checkout – selected automatically


    CBX-122

    Done

    18.09

    22.09

    32m

    Luca Campanaro

    fix styles


    CBX-114

    Done

    18.09

    22.09

    34m

    Luca Campanaro

    implement logo and contacts into email


    CBX-126

    Done

    18.09

    22.09

    22m

    Luca Campanaro

    change the position of button on checkout


    CBX-132

    Done

    18.09

    22.09

    24m

    Luca Campanaro

    change text


    CBX-131

    Done

    18.09

    22.09

    1h 4m

    Luca Campanaro

    fix styles and texts


    CBX-125

    In progress

    18.09

    4m

    Luca Campanaro

    fix the fields when you click back in browser


    CBX-115

    In progress

    18.09

    31m

    Luca Campanaro

    change translations

    Total time

    21h 1m

    Win4Win


    W4W-92

    Done

    20.09

    22.09

    5-7h

    4h 6m

    Chiara Gragnan

    Change the language for some specific pages


    W4W-86

    Done

    22.09

    3h 38m

    Chiara Gragnan

    the images on switcher was disappeared


    W4W-77

    Done

    12.07

    22.09

    2h 18m

    Chiara Gragnan

    Fix translation for error message


    W4W-87

    Done

    15.09

    22.09

    2.5-3h

    2h 31m

    Chiara Gragnan

    Change the bubble for some specific pages


    W4W-88

    Done

    22.09

    1h 34m

    Chiara Gragnan

    Fix deploy process


    W4W-84

    Done

    14.09

    18.09

    1h 30m

    Chiara Gragnan

    fix problem with uploading codes


    W4W-93

    Done

    21.09

    21.09

    1h 19m

    Chiara Gragnan

    upload new codes


    W4W-89

    on hold

    18.09

    10-12h

    37m

    Boris Schaefer

    investigate the task, wait approve


    W4W-91

    on hold

    20.09

    Variant 1 (only link 3-4h)
    Variant 2 (with barcode 14-20h)

    22m

    Boris Schaefer

    investigate the task, wait approve

    Total time

    18h 11m

    Auto-Monkey


    TL-113

    Done

    11.09

    21.09

    2h 16m

    Egzon Cekaj

    investigate new service


    TL-116

    Done

    21.09

    21.09

    2h

    Luca Campanaro


    TL-117

    Done

    21.09

    21.09

    1h 20m

    Luca Campanaro


    TL-119

    In progress

    22.09

    24m

    Luca Campanaro

    Error when download csv


    TL-118

    Done

    21.09

    21.09

    1h 4m

    Luca Campanaro

    Investigate but not need to implement

    Total time:

    7h 4m

    Stingray

    In progress

    325h

    448h 10m (total)
    407h 17m (dev+qa)
    40h 53m (pm)
    15h 23m (last week)

  • 6. Support weekly report 11.09-15.09 (Andrii)

    Project Schedule & Scope Status

    Scope/Projects

    Ticket

    Status

    Opened

    Date of delivery

    Estimation/Budget

    Fact spent

    Asgn

    Comment

    Cobax


    CBX-117

    In progress

    12.09

    2h 36m

    Luca Campanaro

    Make clickable the whole section of product


    CBX-115

    In progress

    12.09

    2h 45m

    Luca Campanaro

    Add text on order confirmation


    CBX-116

    In progress

    12.09

    3h 35m

    Luca Campanaro

    Add text under price


    CBX-114

    In progress

    12.09

    2h 35m

    Luca Campanaro

    Logo and contacts in confirmation email


    CBX-113

    In progress

    12.09

    2h 54m

    Luca Campanaro

    Delete duplications of confirmation email


    CBX-127

    In progress

    12.09

    1h 1m

    Luca Campanaro

    Remove checkbox on checkout about terms and conditions


    CBX-126

    In progress

    12.09

    48m

    Luca Campanaro

    Change the position of the button


    CBX-124

    In progress

    12.09

    31m

    Luca Campanaro

    Remove text that describe the type of payments on checkout


    CBX-112

    In progress

    12.09

    22m

    Luca Campanaro

    Add to the code the service BugHerd


    CBX-128

    In progress

    12.09

    23m

    Luca Campanaro

    Change the name of the button

    Total time

    17h 35m

    Win4Win


    W4W-77

    In progress

    14.09

    7h 31m

    Chiara Gragnan

    Changes for birthday field in registration form


    W4W-83

    In progress

    14.09

    3h 25m

    Chiara Gragnan

    upload new codes


    W4W-84

    In progress

    14.09

    1h 19m

    Chiara Gragnan

    upload new codes


    W4W-85

    In progress

    14.09

    26m

    Chiara Gragnan

    upload new codes

    Total time

    12h 41m

    Auto-Monkey


    TL-113

    In progress

    11.09

    27m

    Egzon Cekaj

    investigate new service, can’t register the account


    TL-115

    Closed

    ~2h

    14m

    Luca Campanaro

    not need customization


    TL-114

    Done

    12.09

    12.09

    1h 1m

    Luca Campanaro

    change the code for template on site STSE

    Total time:

    1h 42m

    UST


    UST-120

    Hold

    11m

    investigate problems with SSL in the client’s office

    Stingray

    In progress

    325h

    432h 47m (total)
    391h 54m (dev+qa)
    40h 53m (pm)