Story 1.1.2.5. CRM. Company view mode. Tab Statuses. Sub tab Activities

Content

General info

The "Activities" sub-tab within the Company View Page Tab Status will display a chronological log of all activities related to the company. This includes updates made to any fields in edit mode, notes added, emails sent or received within processes, and both automated updates (by an Activity Bot) and manual actions performed by specific users. The sub-tab will feature icons representing different types of activities, with the most recent activities shown at the top. Users will be able to scroll through the history of activities.

User story

As a CRM user,
I want to view a chronological log of all activities related to a company in the Activities sub-tab,
So that I can track all changes, communications, and updates efficiently.

Visual design:

https://www.figma.com/design/I5CXH7H3ICD0vfA1kPbcVf/ROCKEN-jobs-%2F-talent?node-id=16335-53352&t=6ItAnLqhDsxejI85-4

Acceptance criteria

01

Scenario 1: Display of Activities

Given I am viewing the Activities sub-tab in the Company View Page,
When I navigate to this sub-tab,
Then I should see a list of all activities related to the company,
AND each activity should be displayed with an appropriate icon indicating the type of activity (e.g., field update, note added, email sent/received).

02

Scenario 2: Order of Activities

Given I am viewing the Activities sub-tab,
When activities are displayed,
Then the most recent activities should be shown at the bottom of the list
AND activities should be scrolled to the bottom to see the latest activities

03

Scenario 3: Display of Activity Details

Given I am viewing the Activities sub-tab,
When I look at an activity entry,
Then I should see details of the activity including what was updated or added, who performed the action, and whether it was done manually or automatically by the Activity Bot.

image-20240817-194310.png

image-20240817-194338.png

04

Scenario 4: Scrolling Through Activities

Given I am viewing the Activities sub-tab,
When there are more activities than can fit on the screen,
Then I should be able to scroll up to view older activities.

05

Scenario 5: Differentiating Activity Types

Given I am viewing the Activities sub-tab,
When I look at the icons next to each activity,
Then I should be able to easily differentiate between types of activities (e.g., an icon for field updates, a different icon for notes, another for emails).

Comments

Leave a Reply